游荡性河床;
Sediment deposit in the reservoir, river bed degradation and channel shifting in the lower Nile, and evolution of the Nile delta coast after the Aswan High Dam impounded are introduced in this paper.
本文着重介绍阿斯旺大坝带来的库区泥沙淤积,下游河道演变和河口海岸的变化,以及采取的治理措施。
Analysis of Influences from Shifting Backward Girder Precasting Bed During Incremental Launching Construction of Zhujiang River West Bridge
顶推法施工珠江西桥时后移制梁台座的分析
纳米英语 · 双语新闻
纳米英语 · 双语娱乐资讯
纳米英语 · 初中英语作文
纳米英语 · 高考英语